ITI’s 18 MW Rooftop Solar Project in Jammu and Kashmir: Bid Now

Introduction

The Indian Telephone Industries (ITI), a public sector undertaking under the Department of Telecommunication, has issued a call for bids to empanel agencies for installing 18 MW of grid-connected rooftop solar photovoltaic (PV) systems on designated government buildings in the Union Territory of Jammu and Kashmir. This ambitious project aims to bolster the region’s renewable energy capacity, contributing significantly to its sustainable development goals.

Project Details

Scope of the Project

The project encompasses:

  • Supply, installation, and commissioning of rooftop solar PV systems.
  • A five-year comprehensive maintenance contract.

These systems will be installed on various government buildings, ensuring a robust and reliable solar infrastructure across the Union Territory.

Key Dates and Deadlines

  • Bid Submission Deadline: July 29, 2024
  • Bid Opening Date: July 29, 2024

This timeline emphasizes the project’s urgency and the government’s commitment to expediting the transition to renewable energy.

Eligibility Criteria for Bidders

Experience Requirements

Bidders must have:

  • Completed at least 1 MW of cumulative on-grid, off-grid, or hybrid solar projects in the last five years.

Financial Requirements

Bidders must:

  • Demonstrate a positive net worth at the end of the previous financial year, verified by an auditor.
  • Have a minimum average annual turnover of Rs 75 million over the last three financial years.

Exemptions for MSEs

Micro and Small Enterprises (MSEs) specified by the Ministry of Micro, Small, and Medium Enterprises, Government of India, are exempt from the EMD requirement if they provide a valid registration certificate along with the technical bid.

Technical Specifications

Grid-Connected Rooftop Solar Systems

The project focuses exclusively on grid-connected rooftop solar power projects. These systems will enhance the energy efficiency of government buildings while reducing their carbon footprint.

Capacity Categories

The rooftop solar systems are categorized into various capacities:

  • 2 kW
  • 3 kW
  • Greater than 3 kW up to 10 kW
  • Greater than 10 kW up to 100 kW
  • Greater than 100 kW up to 500 kW

These categories allow for tailored solutions based on the specific energy needs and capacities of individual buildings.

Financial Aspects

Tender Document Fee

  • Fee Amount: Rs 50,000

Earnest Money Deposit

  • Deposit Amount: Rs 5 million

This deposit serves as a financial guarantee, ensuring the seriousness and commitment of the participating agencies.

Bid Submission Process

Documentation Requirements

Bidders must provide:

  • Technical and financial proposals
  • Proof of previous project completions
  • Financial statements
  • Relevant certifications

Submission Deadline

  • Deadline: July 29, 2024

Opening of Bids

  • Date: July 29, 2024

This immediate evaluation process reflects the project’s priority and the government’s commitment to swift implementation.

Installation and Commissioning

Supply and Installation

The selected agencies will be responsible for:

  • The supply and installation of the rooftop solar systems.
  • Ensuring the systems are securely mounted, connected to the grid, and fully operational.

Commissioning Process

Commissioning involves:

  • Testing the systems to ensure they meet all technical specifications and performance standards.
  • Verifying the reliability and efficiency of the installed solar PV systems.

Warranty and Maintenance

Comprehensive Warranty Details

All materials and systems must come with a comprehensive warranty for at least five years from the completion or handover date, whichever is later.

Five-Year Maintenance Contract

The project includes a five-year comprehensive maintenance contract. This contract ensures that the solar systems remain in optimal condition, providing continuous and efficient energy output.

Regulatory and Compliance

Adherence to Government Standards

The project must adhere to all relevant government standards and regulations. Compliance with these standards ensures the safety, reliability, and environmental sustainability of the installed systems.

Environmental Impact

The adoption of solar power significantly reduces the carbon footprint of government buildings, contributing to the region’s environmental conservation efforts. This project aligns with national and global sustainability goals.

Benefits of the Project

Economic Benefits

  • Cost Savings: Reduced electricity costs for government buildings.
  • Job Creation: Employment opportunities in the renewable energy sector.

Environmental Benefits

  • Greenhouse Gas Reduction: Lower emissions contributing to climate change mitigation.
  • Air Pollution Reduction: Improved air quality in the region.

Challenges and Considerations

Potential Obstacles

  • Logistical Issues: Transporting equipment to remote locations.
  • Technical Difficulties: Challenges during installation and commissioning.

Risk Mitigation

  • Site Assessments: Thorough evaluations to address potential challenges.
  • Project Management: Robust practices and contingency planning to ensure project success.

Future Prospects

Expansion Plans

This project sets the stage for future expansions of solar energy infrastructure in Jammu and Kashmir, paving the way for additional installations on other government and commercial buildings.

Long-Term Goals

The long-term goal is to establish Jammu and Kashmir as a leader in renewable energy adoption, promoting sustainable development and energy independence for the region.

Conclusion

The ITI’s call for bids to install 18 MW of grid-connected rooftop solar systems in Jammu and Kashmir is a significant step towards sustainable development. This project promises economic, environmental, and social benefits, contributing to the region’s overall progress. With careful planning, execution, and maintenance, it can serve as a model for similar initiatives across the country.

Data Summary Table

CategoryDetails
Bid Submission DeadlineJuly 29, 2024
Bid Opening DateJuly 29, 2024
Tender Document FeeRs 50,000
Earnest Money Deposit (EMD)Rs 5 million
Minimum Cumulative Project Size1 MW
Financial RequirementPositive net worth, Rs 75 million average annual turnover over last 3 years
Warranty Period5 years
Maintenance Contract5 years
Capacity Categories2 kW, 3 kW, >3 kW up to 10 kW, >10 kW up to 100 kW, >100 kW up to 500 kW

External Links and Sources

FAQs

What is the deadline for bid submission?

The deadline for bid submission is July 29, 2024.

Are MSEs exempt from any requirements?

Yes, MSEs specified by the Ministry of Micro, Small, and Medium Enterprises, Government of India, are exempt from the EMD requirement if they provide a valid registration certificate with their technical bid.

What is the minimum project experience required?

Bidders must have completed at least 1 MW of cumulative on-grid, off-grid, or hybrid solar projects in the five years preceding the bid submission date.

How long is the maintenance contract?

The project includes a five-year comprehensive maintenance contract.

What are the financial requirements for bidders?

Bidders must demonstrate a positive net worth at the end of the previous financial year, verified by an auditor, and have a minimum average annual turnover of Rs 75 million over the last three financial years.

Leave a Comment

Your email address will not be published. Required fields are marked *