Introduction
The Indian Telephone Industries (ITI), a public sector undertaking under the Department of Telecommunication, has issued a call for bids to empanel agencies for installing 18 MW of grid-connected rooftop solar photovoltaic (PV) systems on designated government buildings in the Union Territory of Jammu and Kashmir. This ambitious project aims to bolster the region’s renewable energy capacity, contributing significantly to its sustainable development goals.
Project Details
Scope of the Project
The project encompasses:
- Supply, installation, and commissioning of rooftop solar PV systems.
- A five-year comprehensive maintenance contract.
These systems will be installed on various government buildings, ensuring a robust and reliable solar infrastructure across the Union Territory.
Key Dates and Deadlines
- Bid Submission Deadline: July 29, 2024
- Bid Opening Date: July 29, 2024
This timeline emphasizes the project’s urgency and the government’s commitment to expediting the transition to renewable energy.
Eligibility Criteria for Bidders
Experience Requirements
Bidders must have:
- Completed at least 1 MW of cumulative on-grid, off-grid, or hybrid solar projects in the last five years.
Financial Requirements
Bidders must:
- Demonstrate a positive net worth at the end of the previous financial year, verified by an auditor.
- Have a minimum average annual turnover of Rs 75 million over the last three financial years.
Exemptions for MSEs
Micro and Small Enterprises (MSEs) specified by the Ministry of Micro, Small, and Medium Enterprises, Government of India, are exempt from the EMD requirement if they provide a valid registration certificate along with the technical bid.
Technical Specifications
Grid-Connected Rooftop Solar Systems
The project focuses exclusively on grid-connected rooftop solar power projects. These systems will enhance the energy efficiency of government buildings while reducing their carbon footprint.
Capacity Categories
The rooftop solar systems are categorized into various capacities:
- 2 kW
- 3 kW
- Greater than 3 kW up to 10 kW
- Greater than 10 kW up to 100 kW
- Greater than 100 kW up to 500 kW
These categories allow for tailored solutions based on the specific energy needs and capacities of individual buildings.
Financial Aspects
Tender Document Fee
- Fee Amount: Rs 50,000
Earnest Money Deposit
- Deposit Amount: Rs 5 million
This deposit serves as a financial guarantee, ensuring the seriousness and commitment of the participating agencies.
Bid Submission Process
Documentation Requirements
Bidders must provide:
- Technical and financial proposals
- Proof of previous project completions
- Financial statements
- Relevant certifications
Submission Deadline
- Deadline: July 29, 2024
Opening of Bids
- Date: July 29, 2024
This immediate evaluation process reflects the project’s priority and the government’s commitment to swift implementation.
Installation and Commissioning
Supply and Installation
The selected agencies will be responsible for:
- The supply and installation of the rooftop solar systems.
- Ensuring the systems are securely mounted, connected to the grid, and fully operational.
Commissioning Process
Commissioning involves:
- Testing the systems to ensure they meet all technical specifications and performance standards.
- Verifying the reliability and efficiency of the installed solar PV systems.
Warranty and Maintenance
Comprehensive Warranty Details
All materials and systems must come with a comprehensive warranty for at least five years from the completion or handover date, whichever is later.
Five-Year Maintenance Contract
The project includes a five-year comprehensive maintenance contract. This contract ensures that the solar systems remain in optimal condition, providing continuous and efficient energy output.
Regulatory and Compliance
Adherence to Government Standards
The project must adhere to all relevant government standards and regulations. Compliance with these standards ensures the safety, reliability, and environmental sustainability of the installed systems.
Environmental Impact
The adoption of solar power significantly reduces the carbon footprint of government buildings, contributing to the region’s environmental conservation efforts. This project aligns with national and global sustainability goals.
Benefits of the Project
Economic Benefits
- Cost Savings: Reduced electricity costs for government buildings.
- Job Creation: Employment opportunities in the renewable energy sector.
Environmental Benefits
- Greenhouse Gas Reduction: Lower emissions contributing to climate change mitigation.
- Air Pollution Reduction: Improved air quality in the region.
Challenges and Considerations
Potential Obstacles
- Logistical Issues: Transporting equipment to remote locations.
- Technical Difficulties: Challenges during installation and commissioning.
Risk Mitigation
- Site Assessments: Thorough evaluations to address potential challenges.
- Project Management: Robust practices and contingency planning to ensure project success.
Future Prospects
Expansion Plans
This project sets the stage for future expansions of solar energy infrastructure in Jammu and Kashmir, paving the way for additional installations on other government and commercial buildings.
Long-Term Goals
The long-term goal is to establish Jammu and Kashmir as a leader in renewable energy adoption, promoting sustainable development and energy independence for the region.
Conclusion
The ITI’s call for bids to install 18 MW of grid-connected rooftop solar systems in Jammu and Kashmir is a significant step towards sustainable development. This project promises economic, environmental, and social benefits, contributing to the region’s overall progress. With careful planning, execution, and maintenance, it can serve as a model for similar initiatives across the country.
Data Summary Table
Category | Details |
---|---|
Bid Submission Deadline | July 29, 2024 |
Bid Opening Date | July 29, 2024 |
Tender Document Fee | Rs 50,000 |
Earnest Money Deposit (EMD) | Rs 5 million |
Minimum Cumulative Project Size | 1 MW |
Financial Requirement | Positive net worth, Rs 75 million average annual turnover over last 3 years |
Warranty Period | 5 years |
Maintenance Contract | 5 years |
Capacity Categories | 2 kW, 3 kW, >3 kW up to 10 kW, >10 kW up to 100 kW, >100 kW up to 500 kW |
External Links and Sources
- ITI Official Website
- Ministry of Micro, Small, and Medium Enterprises
- Solar Energy Corporation of India
- Ministry of New and Renewable Energy
FAQs
What is the deadline for bid submission?
The deadline for bid submission is July 29, 2024.
Are MSEs exempt from any requirements?
Yes, MSEs specified by the Ministry of Micro, Small, and Medium Enterprises, Government of India, are exempt from the EMD requirement if they provide a valid registration certificate with their technical bid.
What is the minimum project experience required?
Bidders must have completed at least 1 MW of cumulative on-grid, off-grid, or hybrid solar projects in the five years preceding the bid submission date.
How long is the maintenance contract?
The project includes a five-year comprehensive maintenance contract.
What are the financial requirements for bidders?
Bidders must demonstrate a positive net worth at the end of the previous financial year, verified by an auditor, and have a minimum average annual turnover of Rs 75 million over the last three financial years.